Mandic reminded that the Republic of Serbia, without charge, transferred land on
57 ha to the City of Novi Sad, to equip infrastructure completely and prepare
conditions to make the lot a modern industrial zone.
According to him, construction permit for the facility has been obtained for the factory hall which will be built on the basis of a contract with the end user, an American Lear company.