Fintel provides EUR 14.5 million for wind farm completion in Kula
This wind farm in Kula, which consists of three wind turbines with an individual capacity of 3.3 megawatts, should become fully operational in December 2014, Fintel announced in a release.
The loan is provided by Erste Bank with a repayment period of 12 years.
Fintel, whose headquarters is situated in the Italian town of Polenza, is also building a wind farm in Vrsac, Vojvodina, with a total capacity of 6.6 megawatts.
The MK-Fintel Wind company that is co-owned by Fintel and Serbia's MK Group has plans to build a wind farm in the municipality of Veliko Gradiste as well.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
25.04.2024. | Construction, Tourism, Sports, Culture
Zlatibor to get recreation lake in “Krst” location – Tender for preparation of documentation for construction of Miladin Pecinar dam opened
25.04.2024. | Construction, Tourism, Sports, Culture
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
24.04.2024. | Construction, Tourism, Sports, Culture
The Nis multifunctional cultural center with 2,000 spaces to be built in another location after all – Contest for preliminary design opened
24.04.2024. | Construction, Tourism, Sports, Culture