Selection in April 2005 - who is going to supply EPS with electric meters, “Iskra” on tender without “East point”
Who of the domestic companies, joint ventures and foreign companies will get the chance to supple Electric Power Company of Serbia (EPS) with the first shipment of 20,000 modern electronic electric meters, will be known in April 2005. That is the time that is needed due to complaints that may be submitted by those who did not pass recent qualification tender announced by EPS.
Electric Power Company of Serbia confirmed that 18 companies had taken part on that tender. These 18 companies offered 16 different types of electric meters.
On that occasion, the bid was sent by Slovenian company "Iskra" alone, not, as it was announced, by joint venture consisting of "East Point" and "Iskra".
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
25.04.2024. | Construction, Tourism, Sports, Culture
Zlatibor to get recreation lake in “Krst” location – Tender for preparation of documentation for construction of Miladin Pecinar dam opened
25.04.2024. | Construction, Tourism, Sports, Culture
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
24.04.2024. | Construction, Tourism, Sports, Culture
The Nis multifunctional cultural center with 2,000 spaces to be built in another location after all – Contest for preliminary design opened
24.04.2024. | Construction, Tourism, Sports, Culture