Potential Change of Route of Second Subway Line – Propositions Made by Egis Being Considered
– The session of the Technical Commission of the City of Belgrade for the Construction of the Subway which I am presiding over. We are considering the propositions made by Egis for the route of Line 2 of the Belgrade Subway – Vesic wrote on his official Facebook profile.
As can be seen from the photograph published by Vesic, one option envisages a slightly different route of Line 2 than previously planned.
More precisely, “Option 2” envisages for Line 2 to encompass the stations: Bezanija Depot-Marka Celebonovica Street-Clinical Center Bezanija-Novi Grad-New Novi Sad Road and further down the route, as previously planned. The change, then, pertains to a turn through Bezanijska Kosa.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
25.04.2024. | Construction, Tourism, Sports, Culture
Zlatibor to get recreation lake in “Krst” location – Tender for preparation of documentation for construction of Miladin Pecinar dam opened
25.04.2024. | Construction, Tourism, Sports, Culture
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
24.04.2024. | Construction, Tourism, Sports, Culture
The Nis multifunctional cultural center with 2,000 spaces to be built in another location after all – Contest for preliminary design opened
24.04.2024. | Construction, Tourism, Sports, Culture