Tender for Preparation of Geotechnical Study for Second Line and Second Phase of First Line of BG Subway Published
According to the technical documentation, the length of the second phase of Line 1 is 4.9 km with 5 stations, whereas Line 2 is 20.6 km long and has 23 stations.
The study of the engineering/geological-geotechnical conditions of the construction which is the subject of this public procurement procedure pertains to the second phase of the construction of Line 1 of the Belgrade Subway, from the Karaburma station to the Mirijevo station, and Line 2, from the Mirijevo station to the Bezanija station. The total length of the section is 25.5 km with 27 stations.
The geotechnical documentation for the purposes of the preliminary project should define all the engineering/geological and geotechnical conditions for the construction of the second phase of Line 1 and Line 2 of the subway system.
– The basic purpose of the documentation is to define the state and the characteristics of the terrain and the stone masses, as well as the established conditions on the terrain that will arise from the realization of the subway system, and based on which the geotechnical conditions and recommendations for the construction of the future subway line for the Preliminary Project level will be defined. The preparation of the documentation should encompass an analysis of the observed space in the interactive zone of the corridor of the second phase of Line 1 and Line 2 of the subway system – the documentation reads.
Bids may be submitted by February 2, 2022.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport