Pekla Plants Esma Plans Construction of Production Complex for Fruit and Vegetable Drying in Kanjiza That Will Spread on Over 9,000 m2
The urban project for this investment has already been realized, and, according to the documentation, the plan is for the future complex to be built in three phases, whereby, in each of the phases, a single-floor facility will be built, meant to house the production complex.
In the first phase, an industrial facility for the drying and storage of fruit and vegetables of 4,676.13 m2 is to be built. The second phase entails the construction of an industrial facility for the storage of fruit and vegetables of 3,043.74 m2, within which warehouses are planned. In the third phase, a facility of 1,463.62 m2 will be built, containing the drying plant premises. The entire production complex will spread on 9,183 m2.
The urban project for the preparation of the production complex for the drying of fruit and vegetables was prepared by Is d.o.o, a designing, engineering and consulting company.
N. Ignjatovic
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
17.04.2024. | Industry, Construction, Transport, Finance
Feka Automotive to build energy-efficient production facility – EBRD approves EUR 15 million
17.04.2024. | Industry, Construction, Transport, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
16.04.2024. | News
Polish chain Zabka to come to Serbia?
16.04.2024. | News