New Access Structures to Pancevo Bridge to be Built – Looking for Designers
The access structures to the bridge across the Danube, on the right coast, were built between 1960 and 1964 and they consists of two rows of independent, pre-stressed bridges. Each route consists of six continuous frame structures and access platforms.
The project from 2007 envisaged interventions on nearly all the elements of the bridge structure, except for the foundations. An examination in 2018 showed advanced damage, due to which the structure needs to be renewed.
The designers need to prepare a preliminary design and project, a feasibility study, the project of demolition of the existing structures, a report of the state of the existing structures, as found, with a study of geodetic works.
Bids may be submitted by November 30, 2020, and more details can be found HERE.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport