Pontoon With Bridge to be Built for International Passenger Terminal in Sremska Mitrovica – Tendering for Contractors Opens
The pontoon will be built as the main pontoon between the international passenger terminal in Sremska Mitrovica, where passenger ships in international and local traffic will dock, and as a safe passageway for passengers from the boat to the pontoon and then to the developed coastal area.
The pontoon will be set up on an approved location, approximately at km 138+800 of the left coast of the Sava, outside of the international waterway of the river Sava.
The auxiliary pontoon will act as support to the access bridge connected with the coast. The connection with the main pontoon will be detachable.
The main pontoon will be made under the supervision of the Directorate for Determining Boat Navigability.
The bridge structure will be 30 meters long. It will lean on the auxiliary pontoon and slide over it freely across a movable fulcrum, in order to enable unobstructed horizontal movement of the bridge with the changing water levels. On the other side, the bridge structure will be fixed at the altitude of the pedestrian lane on the embankment.
The deadline period for the completion of all works is 180 days from the possession of the site.
Bids may be submitted by November 16, 2020.
Most Important News
11.03.2024. | Healthcare
Are Marketing Experts Reading Our Minds? – eKapija Investigates: What Neuromarketing Is and How Much It Is Used in Serbia
11.03.2024. | Construction, Transport
Tender for Continuation of Construction of Patrijarha Pavla Blvd Stopped – Contractors Demanding Price Higher Than Estimated
11.03.2024. | Construction, Transport
11.03.2024. | Construction, IT, Telecommunications
Auction for 5G Network by End-Year, Minister Announces
11.03.2024. | Construction, IT, Telecommunications
28.03.2024. | Construction
Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water
28.03.2024. | Construction
17.01.2024. | Industry, Healthcare
Ceremony of Opening of Centers of Excellence in Kragujevac Planned for Spring – Official Beginning of Operations in June
17.01.2024. | Industry, Healthcare
28.03.2024. | Construction, Healthcare
Price for Construction of Tirsova 2 to Increase After All? – State Negotiating with Potential Contractors About Estimated Value of Works
28.03.2024. | Construction, Healthcare