Veolia Takes Over Control of Central Waste Water Treatment Facility of Vrbas and Kula
– Regarding the output parameters of the processed waste water, CPPOV is working at full capacity, in full compliance with the law. At the moment, the facility operates with less than one third of the input capacity of water, with around 7,000 cubic meters, which causes certain difficulties in operations. It would be much better if the amount increased. Both the water line and the sludge line are operational, the latter a form of secondary treatment, whereby biogas is produced for the purposes of the heating of the digestive treatment. There's also the possibility of production of electrical energy and that part of the process is in the phase of final testing – said Brane Milenkovic, the head of CPPOV in the sectors of technology and maintenance.
Ranko Mitrovic, the acting director of the PUE Precistac Vrbas – Kula, pointed out that the agreement between the municipality of Vrbas and Veolia specifies the obligations of both sides, whereby the local self-government is still obliged to pay the costs of the energy sources – electricity and gas, and to take care of the dehydrated sludge.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
17.04.2024. | Industry, Construction, Transport, Finance
Feka Automotive to build energy-efficient production facility – EBRD approves EUR 15 million
17.04.2024. | Industry, Construction, Transport, Finance