New Korean Investment in Pozarevac – Elias Eco to Build Facility for Processing and Sale of Solar Panels Instead of Waste Incinerator
According to the project documentation, the facility will process the panels to match the dimensions required by the end-user and sell them. The technological process for the processing of the panels involves cutting, finishing works and quality control in line with the certified standards of the EU.
The total area of the facilities is 1,425 m2.
Let us remind that, in March 2019, the City of Pozarevac signed the Memorandum of Cooperation with the director of Elias Eco, Kun Young Park, with the aim of having a facility for the incineration of industrial and medical waste open in Pozarevac. The project has obviously been abandoned after NGOs opposed it, as the facility was supposed to be built close to a food silo.
I. M.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
16.04.2024. | News
Polish chain Zabka to come to Serbia?
16.04.2024. | News
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
15.04.2024. | Transport
Air Serbia flies directly from Belgrade to Mostar in less than one hour
15.04.2024. | Transport