Invitation for engineering design of high-speed road through Backa and Banat for speed of 100 km an hour
The PE Roads of Serbia has opened the public procurement procedure for a feasibility study with a preliminary design for an IB-grade high-speed route Backi Breg (Hungarian border) – Sombor – Kula – Vrbas – Srbobran – Becej – Kikinda – Nakovo (Romanian border).
The route should be parallel with the existing 175-km state road. The high-speed route should have four lanes and be designed for speeds of up to 100 km/h.
The procurement has been estimated at RSD 300 million, without VAT.
Bids may be submitted by March 30, 2020, and will be opened on the same date at 10 am.
Most Important News
11.03.2024. | Healthcare
Are Marketing Experts Reading Our Minds? – eKapija Investigates: What Neuromarketing Is and How Much It Is Used in Serbia
11.03.2024. | Construction, Transport
Tender for Continuation of Construction of Patrijarha Pavla Blvd Stopped – Contractors Demanding Price Higher Than Estimated
11.03.2024. | Construction, Transport
11.03.2024. | Construction, IT, Telecommunications
Auction for 5G Network by End-Year, Minister Announces
11.03.2024. | Construction, IT, Telecommunications
28.03.2024. | Construction
Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water
28.03.2024. | Construction
17.01.2024. | Industry, Healthcare
Ceremony of Opening of Centers of Excellence in Kragujevac Planned for Spring – Official Beginning of Operations in June
17.01.2024. | Industry, Healthcare
27.03.2024. | Industry, Transport, Finance
City to Waive Over 30 Zemun and Palilula Bus Lines to Private Transporters – Draft Public-Private Partnership for 10-Year Period Ready, Job Worth Half a Billion Euros
27.03.2024. | Industry, Transport, Finance