Underpass in New Belgrade waiting for building permit – Tunnel beneath the railway to connect two boulevards
The job was awarded in 2018 to the consortium of Energoprojekt Niskogradnja, CIP and Bauwesen. According to an annex to the agreement, as said at the time, the construction can start no sooner than March, and the new completion deadline is September 2020.
The gross value of the design and the execution of the works is RSD 311.9 million.
Let us remind that an underpass is supposed to be built underneath the existing railway, with three lanes in each direction, a median, sidewalks on both sides and bicycle lanes.
The profile beneath the bridge structure will be 4.75 meters tall.
– We are currently in the process of obtaining the authorization of the project for the building permit from the competent public companies, after which we will file a request for the issuing of the building permit – the Belgrade Land Development Public Agency says for eKapija.
I. Milovanovic
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
23.04.2024. | Construction, Transport
Tender for first section of Belgrade-Nis fast railroad from Velika Plana to Paracin announced
23.04.2024. | Construction, Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
22.04.2024. | Industry, Transport
Serbia to develop project of “flying taxis” for EXPO with Airbus – Signing of memorandum announced
22.04.2024. | Industry, Transport