Completion of Y-road possible by year's end
The Y-road is a bypass route around Subotica, which connects the Kelebija border crossing with the Horgos-Novi Sad highway of a total length of 24 kilometers.
– Our aim is to complete this project by the end of the year, which is why the works need to be as efficient as possible – Mihajlovic said in a conversation with representatives of the public companies Corridors of Serbia and Vojput.
One of the topics at the meeting was the support of rail companies to the end of accelerating the supply of materials to the construction site, the ministry says on its website.
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
10.05.2024. | Energy, Industry, Construction
"Tvrdjava" ecological movement will call for civil disobedience due to the construction of a refinery in Smederevo
10.05.2024. | Energy, Industry, Construction
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
09.05.2024. | Energy, Industry, Construction
Plant for the oil and oil derivatives processing planned in Smederevo; solar panel factory planned in Paracin
09.05.2024. | Energy, Industry, Construction