Repair of Grand Staircase and bridge at Kalemegdan Clock Tower to begin in March
The works will be supervised by conservationists and archaeologists. Since the last reconstruction in 2006, the Grand Staircase has dilapidated. Nearly every step is in catastrophic condition, and the stone slabs are missing altogether in certain spots.
The contracted value of the first phase of the repair of the Grand Staircase is RSD 14,450,521.
The wooden bridge has not had any major works done on it since 1987. This spring, the oak floor structure and the fence will be fully replaced. The works will take around 120 days and are worth RSD 4,594,540.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
23.04.2024. | Construction, Transport
Tender for first section of Belgrade-Nis fast railroad from Velika Plana to Paracin announced
23.04.2024. | Construction, Transport
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
22.04.2024. | Industry, Transport
Serbia to develop project of “flying taxis” for EXPO with Airbus – Signing of memorandum announced
22.04.2024. | Industry, Transport