Modernization of system for transport of ash and slag at TENT A begins – Applications for prequalification procedure to be sent by June 5
The planned investments, including consulting services, are financed by the German development bank KfW in the amount of EUR 45 million, whereas the remaining amount of around EUR 21 million is to be provided by EPS.
Applications for the prequalification procedure are to be sent in English, and the deadline is June 5, it is said in the invitation.
The agreement on the financing of the modernization of the ash transport system at TPP Nikola Tesla, that is, on the loan worth EUR 45 million, was signed by EPS and KfW in February 2017.
As announced at the time, the project will result in improved air quality, as the scattering of the ash from TENT by wind will be prevented, and the project will also protect the underground waters, the Sava and the ground from getting polluted.
As stated in the ad, the project is divided into 6 subsystems: inner system for flying ash, inner system for slag, slag treatment and collection bunker, outer system (transport and depositing of the hydromixture), electrical installations and control and buildings and hydrotechnical facilities.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
24.04.2024. | Construction, Healthcare
Price of construction of Tirsova 2 increases to EUR 141.6 million – Contract awarded to consortium of 10 companies
24.04.2024. | Construction, Healthcare
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
24.04.2024. | Construction, Transport
Dates of publishing of tenders for construction of three sections of fast railroad from Belgrade to Nis known
24.04.2024. | Construction, Transport