Contractor for construction of railway on Ada Bridge to be known by March 10, 2017 – France's Colas Rail offers best price
The Belgrade Land Development Public Agency should disclose which company has been awarded the contract by March 10, 2017.
The deadline for the completion of works is 420 days from the possession of the site, which means that the Cukarica and the New Belgrade coasts will be linked by railway in 2018.
The works entail laying down tram tracks on the Ada Bridge, north and south structures, to be incorporated in the current railway construction, as well as the reconstruction of the current bridge components and the accompanying infrastructure.
The new two-track tram railway will have a total length of 2,700 meters with connections to the current network, and around 1,000 meters of the current tram network will be developed.
The laying down of tram tracks on the Ada Bridge will enable tram transportation in all directions between New Belgrade, Rakovica, Banovo Brdo and the city's center.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport