Works on Bujanovac-Bukarevac railway completed – RZD International reconstructs first of three southern Corridor 10 sections
The superstructure and the substructure of the railway have been completely replaced, five switch points have been installed, 13 railroad crossings have been reconstructed, as well as two stations and low platforms. The contact network has also been renewed. As a result of the reconstruction, the speed of trains has increased to 120 km/h, the report specifies.
The model of performing construction and mounting works in the 36-hour shutdown regime was applied in Serbia for the first time, removing the need for a total shutdown of rail traffic. Furthermore, during the peak period, from mid-June till late August, train traffic carried on uninterrupted.
RZD International continues reconstructing the Vinarci-Djordjevo section, and the plan is for the works on the Vranjska Banja-Ristovac to be completed soon.
The cost of building and modernizing the three southern Corridor 10 sections amounts to more than USD 38 million and is being realized through a Russian state loan.
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
18.04.2024. | Industry, Finance
Here come the new hunters for Serbian gold – Australian Strickland Metals buys mining project on mountain Rogozna
18.04.2024. | Industry, Finance
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
18.04.2024. | Transport
Jovanovic: Purchase of Siemens trams produced in Kragujevac for GSP Beograd should be considered
18.04.2024. | Transport