State Looking for Strategic Partner for Designing and Construction of South Bypass Route Around Valjevo and Bypass Route Around Svilajnac
The obligations of the strategic partner are to prepare the technical documentation (Preliminary Project with Feasibility Study, Project for Construction Permit, Final Project and Built Facility Project) and to carry out the works on the construction of these bypass routes.
According to the public invitation, the south bypass route around Valjevo is the connection of the business zone of the city of Valjevo with the planned corridor of IB-grade state road no. 27, Loznica-Valjevo-Lazarevac, section Iverak-Lajkovac Interchange, that is, the connection of the city of Valjevo with the Belgrade-South Adriatic highway.
The total length of the traffic route will be around 5 kilometers, and it is designed for speeds of up to 100 km/h, with a profile of two physically separated driving lanes, with two traffic lanes for each driving lane.
– The new traffic route, together with the traffic route meant for motor vehicle traffic on the Iverak-Lajkovac section, should take over the transit flows from the existing road network, with a partial change of the conditions on the traffic routes connected to it – the invitation emphasizes.
The bypass route around Svilajnac will be around 12.5 kilometers long and is meant for speeds of up to 80 km/h, with a traffic lane width of 2x3.5 m.
B. P.
The public invitation is open until February 7, more details HERE.
Most Important News
11.03.2024. | Healthcare
Are Marketing Experts Reading Our Minds? – eKapija Investigates: What Neuromarketing Is and How Much It Is Used in Serbia
11.03.2024. | Construction, Transport
Tender for Continuation of Construction of Patrijarha Pavla Blvd Stopped – Contractors Demanding Price Higher Than Estimated
11.03.2024. | Construction, Transport
11.03.2024. | Construction, IT, Telecommunications
Auction for 5G Network by End-Year, Minister Announces
11.03.2024. | Construction, IT, Telecommunications
28.03.2024. | Construction
Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water
28.03.2024. | Construction
17.01.2024. | Industry, Healthcare
Ceremony of Opening of Centers of Excellence in Kragujevac Planned for Spring – Official Beginning of Operations in June
17.01.2024. | Industry, Healthcare
28.03.2024. | Construction, Healthcare
Price for Construction of Tirsova 2 to Increase After All? – State Negotiating with Potential Contractors About Estimated Value of Works
28.03.2024. | Construction, Healthcare