Tender for Designing Novi Sad-Temerin with Bypass Routes Published
According to the program task, the road from the Novi Sad (Temerin) traffic hub to the exit from the Temerin settlements, will be 15 kilometers long. The moving of the part of the route of the state road through the Backi Jarak and Temerin settlements is planned.
It is pointed out that the construction of this road route creates the conditions for a better accessibility for the whole region, the raising of its competitiveness and the future development of the municipality of Temerin, and said state road route is also of significance within the entire road network of the Republic of Serbia.
The corridor will pass through parts of the cadaster municipalities of Cenej, Backi Jarak and Temerin, and the set speed is 80 km/h.
The profile, the routing, the intersections and the bridges will be defined within the preliminary project.
The job is worth RSD 29.2 million.
The tender expires on June 24, and the details can be found HERE.
B. P.
Naš izbor
Most Important News
06.04.2024. | Agriculture
Preconditions for Placement of Fresh Blueberries and Dried Plums in Chinese Market Secured
16.04.2024. | News
Jovan Ciric, Leasing Director Retail MPC Properties – MPC Echo symbolizes our desire for good ideas and innovative endeavors to spread freely and bring about positive changes
16.04.2024. | News
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
Creative Industry – What This Serbian Economy Sector Worth EUR 2 Billion Encompasses
10.04.2024. | Finance, IT, Telecommunications, Tourism, Sports, Culture
16.04.2024. | News
Polish chain Zabka to come to Serbia?
16.04.2024. | News
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
15.04.2024. | Transport
Air Serbia flies directly from Belgrade to Mostar in less than one hour
15.04.2024. | Transport